Welcome to our first Aquatic Centre Update for 2019. While the builders of the Aquatic Centre also enjoyed a well-earned, albeit a short break over Christmas, construction during December and January (to date) has been very productive, with the following achievements:
- Tiling of the 50m swimming pool commenced;
- Grand stand concrete tiers poured;
- Steel framing of the grand stand roof installed;
- Suspended concrete slab of the main pavilion building poured;
- Steel framing of the pavilion structure commenced;
- Sheeting of the grand stand roof commenced;
- Construction of the pool plant building commenced.